HOME > CASES > Detailed explanation
survey:The project volume is 60,000 square meters
region:Deepening of construction design; structural reinforcement; decoration works; Fixed furniture; electrical engineering; air-conditioning engineering; fire protection engineering; Water engineering; IT, AV, intelligent office and security systems and trunki
characteristic:
details >>
Wework 2020-12
survey:Beijing headquarters, Xi'an headquarters, Zhengzhou, Wuhan, Chengdu and other offices have been completed.
region:open office area, independent office, tea room, training room, video conference room, computer room, front lobby reception, etc.
characteristic:The construction period is short, time is short, and demand is tedious.Need to communicate with multiple parties simultaneously. For example: Administration, Small Property, Huawei Leasing Department.
details >>
Huawei 2020-12
survey:Phase I, Phase II and Phase III, with a total area of 36,000 square meters
region:lobby, front hall, office area, antibody center, R & D center, laboratory, kitchen, dining room, computer room, etc.
characteristic:Headquarters office building and laboratory project with very high quality requirements. Belgian designer concept design, deepening design workload Large amount of structural transformation and reinforcement work.
details >>
Nongfu Spring 2020-12
survey:The project volume is 25,600 square meters
region:Open office area, independent office, tea room, training room, meeting room, front hall, AWS, MDF, computer room.
characteristic:Designed by: American IA Concept Design Weak electricity consultant: Hargis, USA IT, AV, security and structural reinforcement
details >>
Amazon 2020-12
survey:350,000sqm
region:front hall, open office area, executive office floor, conference center, coffee area, yoga room, shower room, library, post office, internal stairs, computer room, etc.
characteristic:Currently the largest single project area is 34,000 square meters The project covers Beijing, Tianjin, Shanghai, Guangzhou, Shenzhen, Xiamen, Chengdu, Wuhan, Zhengzhou, Luoyang and other regionsThe client's business is developing rapidly, and the project
details >>
Byte Dance 2020-12
survey:40000sqm
region:front hall, open office area, executive office floor, conference center, coffee area, yoga room, shower room, library, post office, internal stairs, computer room, etc.
characteristic:Short construction period: 132 days for the first phase and 119 days for the second phase. Construction quality requirements: Beijing quality project Environmental requirements: Asia's largest WELL certification project
details >>
Daimler 2020-12
Click to see more
Tel:(8610)59626066 Address:F16, A1 of Building 2,Dacheng International Center,No 78, Middle Section of East 4th Ring Road,Chaoyang District, Beijing, 100124
Copyright©2016 Beijing Greenspace Construction&Design Co., Ltd. All rights reserved.  京ICP备05076206号-1